SAMIL POWERExpert for PV Grid-tied InvertersTMSP-SR-D-V1.2-ENSolarRiver-D PV Grid-tied InverterProduct ManualEnglish
Introduction of SolarRiver-D Series Inverter08Figure 2 Electrical block diagram of SolarRiver-D series inverterFigure 3 Principle description figureAC
Introduction of SolarRiver-D Series Inverter093.6 DimensionFigure 4 Terminals of PV inverter AC OutputAntennaLAN RelayRS-485 Venting ElementDC Inpu
It is normal that the inverter decreases the output power for thermal protection, but if this occurs frequently, you need to check the air-cooling fin
Installation11Figure 7 packing table5 Installation5.1 Installation Process● Ready to install(refer to 5.2、5.3、5.4、5.5)Complete the preparation before
12InstallationType Project No. Description QTY Remark Equipment 1 PV Grid-tied Inverter 1 unitAccessories 2 Bracket1 pc 3 Installation Kit 1set 4
Installation13Figure 8 Space specificationFigure 9 Incorrect installationmax 1530cm 30cm30cm 30cmSo lar Ri ve rNormal FaultOKESC● Prone to be damaged
Installation145.5 Installation ToolsThe below tools are needed before installation.5.6 Installation StepsStep1: Drill holes in the wall with di
Installation15Step 2: Put the inverter onto the bracket.Step 3: Use M5 hex key nut to fix the bottom of the inverter.Step 4: Lock the inverter and the
16InstallationTable 2 DC Voltage LimitationFigure 10 Multi-string input connection (Left) and common-string input connection (Right)Ensure that the DC
InstallationNote!Please don’t connect the PV positive or negative to ground. Figure 11 Connection of the connectorFigure 12 Use multimeter to measure
InstallationTable 3 Cable and Micro-breaker ruleFigure 13 Incorrect Connections between Load and Inverter18InputOutputSo lar Riv erESC OKFigure 14 AC
InstallationFigure 15 AC connector disassembling guide19Threaded sleevePressure screwNLSocket elementThreaded sleeveConnected wiresPressure screwThis
InstallationFigure 16 grounding of system20Socket element with threaded sleevePressure screwThreaded sleeve Pressure screwPV StringInverterPELNPV modu
Run the InverterFigure 17 start-up interface21Press OK to start commissioningSAMIL POWER CO., LTD.SolarRiver 5200TL-DS521233001V1.00V1.00V2.23Inverter
Run the Inverter22Date/TimePress OK to confirm0 1 22 3 0 31 0 1: 00DDMMhh mmYYYY- -Up/Down : Increase/Decrease valueLeft/Right : Move SelectionEngl
Run the Inverter & Operation23Table 4 LED statutesEnd commissionPress OK to confirmCurrent Country:GermanyPress OK to Start runningPress ESC to
Operation24Figure 19 home interfaceHome2012-03-03 10 00 00: :Press Esc to Main MenuPowerTodayTotal0.0 W0.0 KWh0.0 KWh=~208.4 V205.9 V1.045 kw49.99 H
Operation25Figure 21 settings interfaceSettings2012-03-03 10 02 25: :Press Esc to Main MenuLanguageDate/TimeClear dateClear eventsLCD contrastCou
Operation26B: By clicking on the serial number, the Solar Power Browser interface shows as the figure below. For detailed settings please refer to ste
Operation27A. Fixed cosphi setting, as per the following figure. Click on the drop-down menu, select Overexcited or Underexcited, fill in the cosphi
Copyright DeclarationThe copyright of this manual belongs to Samil Power Co., Ltd. Any corporation or individual should not plagiarize, partially copy
Operation28Control modeLocalRemoteCommunicationOnOffPin1-highlowhighlowPin2-highhighlowlow47.5-51.5 HzFrequency range47.5-51.5 Hz49.5-50.5 Hz49.5-50.5
Operation29D. Active power derating set, as per the following screenshot. Insert the ratio of the active power and rated active power, the range is 0%
30Operation Pot100%50%0%100%Pn50%PnActive power InE. Active power derating settings, as the following picture. Fill in the ratio of the active power
Communication and Monitoring31Figure 22 Ethernet communicationWANRouter8 Communication and Monitoring8.1 Communication InterfaceStandard configuration
Communication and Monitoring32Home2012-03-03 10 00 00: :Press Esc to Main MenuPowerTodayTotal0.0 W0.0 KWh0.0 KWh=~208.4 V205.9 V1.045 kw49.99 Hztkwh
Communication and Monitoring33Ethernet2012-03-03 10 16 40: :Confirm?Auto-IP/DHCPManual-IPCurrent mode: Auto-IP/DHCPEthernet2012-03-03 10 16 23: :P
34Communication and MonitoringEthernet2012-03-03 10 22 50: :Confirm?Auto-IP/DHCPManud-IPCurrent mode: Manual-IPManual-IP2012-03-03 10 26 05: :Pres
Communication and Monitoring35orange whiteorange green whiteblueblue whitegreenbrown whitebrown12345678Figure 24G/ GB/ Br/ BrO/ O B1 2 3 4T-568B5 6 7
Communication and Monitoring36green whitereserve reservegreenorange whiteorange123456Figure 26 WIFI communicationWANRouterFigure 258.2.3 WIFI Communic
Communication and Monitoring37WIFI settings:Note: Appendix is WIFI route list.Step 1: Connect a cable following the steps of Ethernet before opening &
38Communication and MonitoringNetwork2012-03-03 10 27 23: :Press OK to confirmEthernetWIFIWifi2012-03-03 10 28 10: :Press ESC to BackLink Na
Figure 27 Event list interfaceEvents list2012-03-03 10 42 07: :Press ESC to Main MenuCode Message40Bus over voltage2012-03-03 10 40 36: :10PV2
Troubleshooting and Maintenance40SCI/ SPI communicationfault- Disconnect DC and AC side, and connect them again.- Or, please ask for help.PV1/ PV2 iso
Decommissioning & Technical Data4110 Decommissioning10.1 Decommissioning Steps1. Switch off the AC grid;2. Switch Off the DC switch;3. Wait 5 minu
42 Technical Data11.2 Output (AC)<3%ModelSolarRiver3400TL-DSolarRiver4000TL-DSolarRiver4500TL-DSolarRiver5000TL-DSolarRiver5200TL-DAC nominal power
Guarantees43 Appendix:AppleAirPort Express with 802.11n A1264A1301AirPort Extreme Simultaneous dual-band 802.11nAirPort Extreme Simultaneous dual-band
44GuaranteesContinued:Wireless-N Broadband Router E1000Wireless-N Broadband Router M10Wireless-N Gigabit Router M20Wireless-N Broadband Router E1000(v
Guarantees45Continued:IO Data I-O DATA WN-G54/DCR WN-G54/DCRMotorolaSymbol AP-5131 AP5131NECAterm WR4100N WR4100NNEC PA-WR8170N-HP PA-WR8170N-HPNEC PA
CONTENTS4 Operation Mode ... 10031
Marketing & Sales OfficeAdd: No.52,Huigu Innovation Park, Huishan District, Wuxi,Jiangsu Province,P.R.China 214174Tel: +86 510
0410.1 Decommissioning Steps ...10.2 Package ...
Notes on This ManualDanger!Danger indicates a hazardous situation, if not avoided, will result in death or serious injury.Note!Note provides tips abou
Notes on This ManualEnsure input DC voltage ≤ Max.DC voltage .Over voltage may cause permanent damage to inverter or other losses, which will not be i
Figure 1 PV Grid-tied System07Grid-tied System Brief Introduction & Introduction of SolarRiver-D Series InverterPV modules Inverter Public grid3 I